皇冠信用网
热门标签

Telegram游戏频道(www.tel8.vip):Ranhill Utilities gets 4-year PPA extension for solar project

时间:1个月前   阅读:6   评论:1

Telegram游戏频道www.tel8.vip)是一个Telegram群组分享平台。Telegram游戏频道包括Telegram群成员导出、telegram群组索引、Telegram群组导航、新加坡telegram群组、telegram中文群组、telegram群组(其他)、Telegram 美国 群组、telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容。Telegram游戏频道为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。

KUALA LUMPUR: Ranhill Utilities Bhd’s wholly owned subsidiary Ranhill Solar I Sdn Bhd (RSI) has obtained a four-year extension of a power purchase agreement (PPA) for the 50MWac large-scale solar photovoltaic plant at Batang Padang, Perak under the LSS4@MEnTARI.

In a filing with Bursa Malaysia, Ranhill said it received a notification letter from the Energy Commission (EC) on the extension of the financial closing date (FCD), scheduled commercial operation date (SCOD), and effective period of PPA for the solar plant.

Ranhill said the project's FCD has been extended to Sept 30, 2022 from June 30, 2022 while the SCOD was extended to Dec 31, 2023.

“The revised terms for the PPA will govern the obligations of RSI and Tenaga Nasional Bhd (TNB) to sell and purchase the energy generated by the facility to TNB for a period of 25 years from the commercial operation date. With the new effective period announced, the facility will be operated and maintained up until 2048,” Ranhill said.

,

新2网址www.99cx.vip)实时更新发布最新最快最有效的新2网址,包括新2手机网址,新2备用网址,皇冠最新网址,新2足球网址,新2网址大全。

,

“The new effective period of the PPA will be stipulated under the supplementary agreement of PPA which will be signed between RSI and TNB,” it added.

Ranhill expects the supplementary agreement of PPA to contribute positively to the future earnings of Ranhill Group.


转载说明:本文转载自Sunbet。

上一篇:AirAsia X posts RM652.51mil net loss in 4Q

下一篇:皇冠官网开户(www.hg108.vip):Austerity measures won\u2019t affect national security, says PM

网友评论