皇冠信用网
热门标签

Pansar eyes key role in state development

时间:1个月前   阅读:4

足球预测专家www.99cx.vip)是一个开放皇冠体育网址代理APP下载、皇冠体育网址会员APP下载、皇冠体育网址线路APP下载、皇冠体育网址登录APP下载的官方平台。足球预测专家上足球分析专家数据更新最快。足球预测专家开放皇冠官方会员注册、皇冠官方代理开户等业务。

Pansar's chairman, Datuk James Tai Cheong, said Pansar aims to play a role in the state infrastructure development via projects such as the Sarawak Second Trunk Road project, upgrading of state coastal roads, road linkages to villages, water supply grid programme, rural electrification as well as telecommunication infrastructure projects.

KUCHING: Pansar Bhd is eyeing more key infrastructure projects listed by the Sarawak government in its Post Covid-19 Development Strategy 2030 (PCDS 2030).

Its chairman, Datuk James Tai Cheong, said Pansar aims to play a role in the state infrastructure development via projects such as the Sarawak Second Trunk Road project, upgrading of state coastal roads, road linkages to villages, water supply grid programme, rural electrification as well as telecommunication infrastructure projects.

Among the initiatives and major projects planned under PCDS 2030 that were highlighted by Sarawak Premier Datuk Patinggi Abang Johari Tun Openg at its launch in July 2021 are the development of autonomous rail rapid transit Kuching Urban Transportation System (estimated cost of more than RM5bil), expansion of terminals at the Kuching and Sibu Airports and new deep sea ports at Kuching and northern Sarawak.

The new key industrial projects include the development of Petrochemical Hub and bio-industrial park in Bintulu, which is currently underway, as well as free industrial zones around the new deep sea ports as well as a furniture park and extension of the Samajaya Hi-Tech Park.

To support the industrial development, a Pan Sarawak gas pipeline will also be built.

The PCDS 2030 has seven strategic thrusts and is anchored on six economic sectors as the main engines of growth, which will be supported by seven enablers.

,

竞彩推荐www.99cx.vip)是一个开放皇冠体育网址代理APP下载、皇冠体育网址会员APP下载、皇冠体育网址线路APP下载、皇冠体育网址登录APP下载的官方平台。竞彩推荐上竞彩分析专家数据更新最快。竞彩推荐开放皇冠官方会员注册、皇冠官方代理开户等业务。

,

Tai said Pansar is currently constructing the Batang Lupar bridge, the longest riverine bridge in Malaysia, in Samarahan Division.

The Batang Lupar bridge, with a contract value of RM848.8mil, is one of the nine major bridges to be built under the Sarawak coastal road network which stretches a massive 896km. Several other bridges are also in various stages of construction

The on-going 225km Second Trunk Road project will become an alternative road to the Sarawak Coastal Road and Pan Borneo Highway network which will significantly shorten the travelling time from Kota Samarahan to Sibu.

Most of the work packages under Pan Borneo Highway Sarawak are due for completion this year.

Tai said other notable infrastructure projects Pansar is implementing now are the Universiti Malaysia Sarawak Teaching Hospital (worth RM486mil), mechanical and engineering works on the Shell Headquarters in Miri and retrofitting of the Sarawak Timber Industry Development Corp building in Kuching.

Pansar’s total order book for these projects (including Batang Lupar bridge) is RM1.4bil.

上一篇:telegram中文群组(www.tg888.vip):‘Hopeless’: Chinese homebuyers run out of patience with developers

下一篇:新2线上开户:Dewan Negara passes 5 bills

网友评论